Showing posts with label Olympics. Show all posts
Showing posts with label Olympics. Show all posts

Sunday, February 28, 2010

Finished! I Finished! I FINISHED!

Well, as you know I've been participating in both the Ravelympics and the Knitting Olympics. The goal was to cast on and complete an entire challenging project during the seventeen days of the Olympics. Well, last night, with one day to spare, I finished my sweater!

I actually finished the knitting back on Thursday, but it took several nights of work to do all the seaming/sewing together. It's not perfect, by far, but I think my sweater turned out pretty well. I'm SO excited that I actually finished it in time. I really didn't think I had a chance at first.

I love how the sweater turned out. I love how light and drapey the fabric is. I'm so glad I changed the sleeves to a more bell-shaped 3/4 sleeve. I think they are more fun and flirty and more fitting to the fun feel of the sweater. I love the shape and weight and the fun little twist of fabric at the back of the neck. Very fun sweater!


I didn't really enjoy working with this yarn. It is very thin, but also fuzzy enough to be grabby, so it was very easy to drop stitches. I spent a LOT of time counting stitches and going back and finding dropped (or sometimes picked up stitches). This is probably the most UNEVEN my stitches have ever looked. Despite all of this, I love the finished project and would use this yarn again because of the way it looks.

Pattern: Ripple Cardigan by Coralie Meslin
Yarn: 4 skeins of Schulana Kid Seta (70% Kid Mohair/30% Silk/ 25g/ 210m) in Color #7 Tangerine
Needles: Size 3 circulars (Cast on with Size 5--because I always cast on really tightly)
Modifications: Changed shape and length of sleeves to 3/4 bell. Cast on 90 st. Knit even for 8 rounds. On RS, decrease 2: K2, SSK, K to last 4 st, K2tog, K2. Repeat decrease row every 8th row 6 more times until there are 76 st. Knit 15 rows even ending with a WS row. Follow pattern directions for sleeve cap.


I Finished!
And I got my awards :).

Thursday, February 25, 2010

Olympic Update

I just finished knitting the second sleeve. All pieces of my sweater are now knitted. Next, I need to block the sleeves and then SEAM, SEAM, SEAM. Wish me luck!

Wednesday, February 24, 2010

Day 12

Finished the first sleeve. Started the second sleeve. 75% of a sleeve and LOTS of seaming to go!

Tuesday, February 23, 2010

Darn!

Well, I had my first major Knitting Olympics/Ravelympics setback tonight. I did NOT finish my first sleeve or start my second. Instead, I knit two extra repeats of an eight row decrease and then knit sixteen rows even before realizing my mistake. After ripping back and getting my stitches back on the needles properly, I am heading to bed. I am tempted to stay up and finish the sleeve, but I am tired and afraid I will do something stupid again. Darn you distracting ice dancing! Darn you busy life that kept me from knitting much the last two days and made me too much in a hurry to stop and bother looking at my notes on the pattern. Oh well! Could be worse. Happy Monday, everyone!

Monday, February 22, 2010

Olympics Update

Today is Day 11 (out of 17) of the Olympics. I am happy to report that I am still on target. I have finished the back and both fronts of my cardigan. I've started the first sleeve which I am modifying. So far so good. I even ordered blocking mats and blocking wires and used them to block the back and fronts. Wow. What a difference that made. I hope to finish the first sleeve and start the second tonight. After sleeves, my favorite part--seaming! (Please read that sentence with LOTS of sarcasm).

Friday, February 19, 2010

Oh, What a Day!

Well, my day started early this morning with a little voice saying some of the words a mother fears most: "Mommy, I throwed up in my bed." Poor J was actually pretty unfazed by the whole thing, but we were up for almost 2 hours getting him and his room clean and then trying to get him to go back to sleep. Luckily, that seems to be the beginning and the end of it and he was fine all day. I made him stay home from school and fed him stomach-friendly foods, but he never threw up again. So hopefully he will continue feeling well tomorrow.

In other news, we had lovely weather again today and the boys and Pepper and I got to spend lots of time outside in the backyard. It was sunny and slightly breezy and it just felt so nice to enjoy some fresh air. Both boys had fun "fixing mommy's house" by moving sand around the patio and fixing my house with "concrete" (all J's idea.) N spent forever scooping up sand into a little plastic train car, dumping it back out, and refilling it again--over and over and over. Then J and I spent a good amount of time kicking a ball around and pitching and batting. J had me pitch to him and he hit a lot more than I expected (especially with my great athletic abilities). I was pretty proud of both of us. Pepper was so excited to have us outside with her that she ran about a hundred figure eights.

Then tonight--Day 7 of 17--I finished the right front of my sweater and got a few rows done on the left front. Still on target! Wish me luck.


And, in even better news, B returns home tomorrow. Last weekend we got to see him all of 20 hours because he got stuck up in the Northeast for work and his flights kept getting canceled. This week he's been gone since Sunday afternoon so we are all excited to have him home so we can spend some quality family time together.

So for a day that started off pretty awful, it's ending up quite nicely. Life is good.

Thursday, February 18, 2010

Day Six

I'm still plugging along on the right front. About 3 1/4 more inches to go. Should be able to do that tomorrow and even possibly start on the left front. The endless stockinette is getting a little old, but I'm not allowing myself to think too much about that. The Knitting Olympics/Ravelympics are definitely helping motivate me to plug away on this sweater. Off to bed. I'm still staying up way too late to knit. I know, I know, I'm crazy.

Wednesday, February 17, 2010

Day Five


This is the right front (or what I've knit of the right front). I've given myself two more days to finish it. It's worked side to side so it seems to take longer as there are more stitches per row, but hopefully the fact that it is worked for a little over half as many inches as the back will make up for that. Still some issues with dropped stitches, but I seem to be doing a little better. I only watched a little of the Olympics last night as I find the ice skating way too distracting when I'm trying to knit this sweater. I hate watching people fall and have their dreams shattered. I know that it is an amazing feat to even make it to the Olympics, but I still feel SO sad for them when they fall.

Happy Hump-day, everyone!

Tuesday, February 16, 2010

Day Four


Even with the distraction of Pair Figure Skating--Free Style, Men's Snowboard Cross and Men's Downhill, I'm still on track. The Olympics are making me feel very patriotic. Go, USA! And two lovely knitters are making me happy for the Canadian successes as well. So many good moments tonight!

Monday, February 15, 2010

Day Three


This is actually about an inch longer than it appears, but I couldn't get it to stay flat for the photo. Anyway, I have about 5 1/2" to go and I will be done with the back. I am giving myself four days for the back and three days each for the left front, right front, left sleeve and right sleeve. That will get me up to 16 of the 17 days. Wish me luck! Maybe, just maybe, I'll actually be able to do this!

Sunday, February 14, 2010

Day Two


Making progress. If I can finish this back by Tuesday than I might MIGHT be able to finish this sweater in 17 days. Wish me luck!

Saturday, February 13, 2010

Olympic Update: Day One

Don't think I'm going to be winning any gold medals. I got a late start on my cast-on and knitting as I was out ice-skating when the opening ceremony began. I got home around 9:30 and stayed up late knitting (but didn't watch a second of the Olympics--it's too interesting to be good knitting TV). I only got about 2 inches of the back done.



This yarn is so tiny, but also kind of grabby (frogging it would be a nightmare) that I keep getting dropped stitches. I've started counting every row. Not the fastest way to do it, but better than going back searching for the dropped stitches. Oh well. I don't think there is anyway I can get this sweater knit in the next 16 days, but I'm going to try anyway. Happy knitting, everyone!

Thursday, February 11, 2010

Because I am Crazy...

Last night I did this:I was prepping for the Ravelympics and the Knitting Olympics. The Knitting Olympics are the brain child of the wonderful Stephanie Pearl-McPhee and are designed to inspire knitters to challenge themselves and create a finished item during the Olympics. The Ravelympics were created by the people at Ravelry and were inspired by the Knitting Olympics, but have been expanded to included crocheters as well. I have never participated in either, but have been intrigued by the concept and the thrill of the challenge.

Anyway, this year I decided to try it. I signed up for both. My local knit shop inspired me by sponsoring a team for Ravelympics. The rules for our team is that you have to either use yarn or pattern purchased at the shop. As I'm someone who doesn't stash a lot of yarn (especially more expensive knit shop yarn), I only had three choices of projects using yarn from my knit shop: J's school bus sweater, the Slanting Gretel Tee for my sister and the Ripple Cardigan for me. I had already cast on for J's sweater and the rules state that you can't cast on until the opening ceremonies (8PM CST on Friday, February 12, 2010) so that was out. I considered doing my sister's tee because I need to have it done by her birthday in March, but didn't want to rush through it and make mistakes. It's not a difficult pattern, but with the multiple cables and triangle pattern there are lots of opportunities to make a silly mistake. So I ended up deciding to do the Ripple Cardigan. Yes, I've decided to knit myself a whole cardigan with laceweight yarn done on size 3 needles in 17 days. As you know, I have two children under four who have to be fed, entertained and generally taken care of. I also should clean and cook occasionally. Oh yeah, and B is REALLY busy at work right now and will be pretty sparse for the next month or so. Yeah, I am definitely crazy.

Want to be crazy too? Go here to sign up for Knitting Olympics or here to sign up for Ravelympics. See you there, fellow crazies!